• Skip to main content
  • Skip to footer

Valcourt Group

  • Services
    • Window Cleaning & Glass Restoration
    • Pressure Washing
    • ProXpress: Rapid Leak & Exterior Repairs
    • Waterproofing Services
    • Façade Restoration & Repair
    • Fall Protection Solutions
    • Additional Building Services
  • Locations
  • Industries
    • Commercial Real Estate
    • Apartments & Condominiums
    • Parking Structures
    • Facilities
    • Hospitality
    • Healthcare
    • Universities & 
Schools
    • Industrial Parks
    • Retail Buildings
    • Government & Municipality
    • Senior Living
    • Stadiums
  • Logo
  • About Us
    • About Us
    • Join The Valcourt Group
    • Careers
  • Insights
    • News
    • Blog
    • Resources
    • Projects
  • Contact Us
Search Btn

Rooftop Tent Tieback Anchor Installation at Marina Hotel

— The Valcourt Group | Apr 04, 2024

The Challenge

Valcourt Safety Systems (VSS) was hired by our client to install tent anchor tiebacks on their rooftop. After numerous delays due to client revisions of the design, the client required the work to be completed in less than one month to host a holiday party in the newly renovated space.

Prior to project kick-off, the primary challenge was ensuring that all project materials would be on site in under one week to meet the deadline. While the tieback anchors were in stock, the client added tent leg support posts to the project scope. This required fabrication, galvanization, and delivery of the pedestals on site to start the project. The typical lead time to complete this from a standard manufacturer is six weeks.

To save time and ensure prompt delivery, VSS leveraged the resources of another Valcourt Group company, JOBS-AMST, to fabricate the tent leg support posts. One day before the start date, the client revised the orientation of the design. The VSS team quickly created a new design with client approval.

The Solution

Once the project was underway, the Valcourt team laid out the anchor tiebacks and leg supports, while ensuring there were no obstructions to the special events kitchen underside. Next, a routine inspection by the Fire Marshal revealed the building lacked a compliant roof access and egress plan. Valcourt paused work to develop the plan with the client. It was approved by the Fire Marshal the same day, enabling our team to get back to work.

With the end in sight, Valcourt was then stopped by the General Contractor inquiring about tent alignment. Because of our meticulous coordination ahead of time, Valcourt teams were confident the alignment was within 1/8 inch. Ultimately, the tent company confirmed our measurement accuracy.

Despite the challenges, Valcourt completed the project with one day to spare! The client and General Contractor were thoroughly impressed with the efficiency, organization, and communication of the Valcourt Group, all while staying on budget.

Progress Photos 

Tent leg supports and anchors with tent framing

Tie-down anchor engineered to meet tent manufacturer
specifications and clearance requirements

Preliminary layout to ensure proper tent framing
alignment and coordination of underside obstructions

Tent leg support: custom-designed to fit under pavers

Work Performed

  • Design Engineering
  • Anchor Installation

Valcourt Safety Systems: Delivering Turnkey Solutions For Every Building

When it comes to accessing the exterior and interior of buildings, safety starts at the top. Each building has unique features, so effective and compliant rooftop safety systems require a specialized approach.

Valcourt Safety Systems maximizes safety for workers and ensures OSHA compliance for building owners by designing, installing, and certifying fall protection and rooftop anchorage systems.

Contact us today to request a quote.

Rooftop Fall Hazard Assessment safety compliance documentation

Popular Posts

Below-Grade Leak Sealing: The Smithsonian National Museum of African American History & Culture
Project Profiles, Waterproofing & Restoration

Below-Grade Leak Sealing: The Smithsonian National Museum of African American History & Culture

The Challenge Located on the National Mall in Washington DC, the Smithsonian's National Museum of African American History & Culture is the only museum dedicated to the documentation of African...

Read More
State-of-the-Art Safety Systems Installation
Project Profiles, Safety & Fall Protection

State-of-the-Art Safety Systems Installation

The Challenge Located in the Penn Quarter neighborhood of Washington DC, this former media museum was acquired by our client in 2019. Soon after, the owners embarked on a massive,...

Read More
Second High Reservoir: Expansion Joint Repair and Urethane Injection
Project Profiles

Second High Reservoir: Expansion Joint Repair and Urethane Injection

The Challenge Located in Washington, DC., Second High Reservoir is a key component of the Washington Aqueduct, a water treatment and supply system that provides safe drinking water to roughly...

Read More

ABOUT US

  • About Us
  • Join The Valcourt Group
  • Careers
  • News
  • Blog
  • Resources

SERVICES

  • Window Cleaning & Glass Restoration
  • Pressure Washing
  • ProXpress Rapid Leak & Exterior Repairs
  • Waterproofing Services
  • Façade Restoration & Repair
  • Fall Protection Solutions
  • Additional Building Services

INDUSTRIES

  • Commercial Real Estate
  • Apartments & Condominiums
  • Parking Structures
  • Facilities
  • Hospitality
  • Healthcare
  • Universities & Schools
  • Industrial Parks
  • Retail
  • Government & Municipality
  • Stadiums

Contact Us

dashicons-phone 1-800-222-9533
dashicons-email [email protected]

dashicons-linkedin dashicons-facebook-alt

  • Privacy Policy
  • Applicant & Worker Privacy Notice
  • Web Accessibility
  • Site Map
  • Personal Data Request

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service app.